Product Detail :
|
Supply and installation of track gauge cum level calibration and resetting bench make pie. salientfeatures of the supply would be steel and aluminium fabrication designed for permanent installation. fitted withcnc machined uic 60 kg. rail set unique design to ensure that important parameters are retained for couple ofyears. bench is supplied with maters calibrated from third party nabl approved labs installation at site would becarried by our engineers, our technicians would train railway personnel for one to two days on method torecalibrate gauges and carry out mirror servicing. minor repair tools will form part of supply. detailed as perannexure.
|