Product Detail :
|
Design, manufacture, supply, testing, commissioning ballast cleaning machine (bcm) & trainingof indian railway personnel supply of lump sum cost of the set of spares per ballast cleaning machine (bcm) required for 1200effective working hours of the machine during warranty period as defined in clause 20.0 of the technical specification of the machine. the set of spares offered shall exclude consumables such as wear plates, cuttingchain conveyor belt, screen mesh, all types of filters. supply of servicing and break down maintenance charges ( 8 hours per day) including lodging and boardingfor the service engineer, during post-warranty 3 (three) years annual maintenance contractat (location) zonal railways maharashtra 360.00 man-days4 4 service(y)non stock --- yes consignee inr conveyance charges for journey on deputation performed by the service engineer, during postwarranty 3 (three) years annual maintenance contract. the contractor will be paid per km of actual distancetravelled between oem's service centre to place of work (to & fro).at (location) zonal railways maharashtra 432000.00 kilometre3. t and cf.o.r (for indigenous offers)descriptiondestinationdelivery period supply of conveyance charges for journey on deputation performed by the service engineer, during postwarranty 3 (three) years annual maintenance contract. the contractor will be paid per km of actual distance travelled between oem's service centre to place of work (to & fro).at (location) zonal railways maharashtra 432000.00 kilometre3. t and cf.o.r (for indigenous offers)descriptiondestinationdelivery perioddescription delivery /completion rate of supplyfor all items completion within 30 monthspayment termss.no descriptionpayment terms (indigenous offer)1 as per clause 11 of instructions to tenderers given in tender document
|